Quick answers
What is this project?
Proposed Expansion of Sugar Mill Cane Crushing Capacity From 10000 Tcd to 13000 Tcd is an approved industrial project in Girdharpur, Dhampur, Bijnor, Uttar Pradesh. The site covers 107.9 acres.
Who is building it?
The applicant is M/S Avadh Sugar and Energy Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Nov 2022), as of 27 Nov 2026.
Where is it?
In Girdharpur, Dhampur, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹469.5 crore and a site of 107.9 acres.
When was it filed?
The application was filed on 15 Nov 2022.
Project details
| Official title | Proposed Expansion of Sugar Mill Cane Crushing Capacity From 10000 Tcd to 13000 Tcd Along With Co- Gen Power From 24.0 MW to 44.9 MW Within Existing Premises by M/S Avadh Sugar & Energy Limited, Unit: Seohara |
|---|---|
| Status | Environmental approval granted |
| Status since | 15 Nov 2022 |
| Application filed | 15 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | M/S Avadh Sugar and Energy Limited |
| Land area | 107.9 acres (43.7 ha) |
| Project cost | ₹469.5 crore |
| Village / locality | Girdharpur |
| Taluk / tehsil | Dhampur |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00048 |
In context
8 applications in Bijnor since January 2022 are in the same category (Industry): 5 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Girdharpur, Dhampur, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 3.9 km away
- M/S Bharat Petroleum Corporation Limited Meerut By Proposed A retail outlet… — forest land use approved, 4.5 km away
- Diversion 1.5ha Reserved Forest Land under social forestry division Bijnor… — more information requested, 6.5 km away
- Diversion of Forest Land for Construction of New Road — lapsed, 12 km away
- Certificate of "no Increase in Pollution Load" for Addition of Alternative… — initial checks, 12 km away
- Proposed expansion of Sugar unit from 14000 TCD to 15000 TCD without change in… — environmental approval granted, 12.5 km away
- Proposed expansion of Sugar unit from 14000 TCD to 15000 TCD without change in… — cleared for impact study, 12.5 km away
- Diversion of Forest Land for the Work of 4 Lane Widening and Strengthening of… — in-principle approval, conditions pending, 14.5 km away
All 7 Avadh Sugar & Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.