Quick answers
What is this project?
Riverbed Sand Mine from Yamuna River, Village- Sadimadanpur, (Gata No.- Part of 56, 57, 92/6, 93/1, 94, 95/2, & Part of 60/1/3, Area-18.50 Ha.) Tehsil- Pailani, District– Banda, Uttar Pradesh Project Proponent- M/s A.S. Traders (Shri Ashok Kumar) is a proposed mining project in Sadi Madanpur, Banda, Uttar Pradesh. The site covers 45.7 acres.
Who is building it?
The applicant is Ashok Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Sadi Madanpur, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 45.7 acres.
When was it filed?
The application was filed on 27 Oct 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Riverbed Sand Mine from Yamuna River, Village- Sadimadanpur, (Gata No.- Part of 56, 57,…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 26 Dec 2024 |
| Application filed | 27 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Ashok Kumar |
| Land area | 45.7 acres (18.5 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Sadi Madanpur |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02369 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 27 Oct 2024 (this page) | Returned to applicant | 45.7 acres | ₹90 lakh |
| New project filed 21 Aug 2024 | Environmental approval granted | 45.7 acres | ₹90 lakh |
| Early planning filed 8 Nov 2023 | Cleared for impact study | 45.7 acres | ₹90 lakh |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 45.7 acres, this one is larger than 66% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 89 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Sadi Madanpur, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Sand Mine from Yamuna River, Village- Sadimadanpur, (Gata No.- Part… — environmental approval granted, 0 m away
- Riverbed Sand Mine from Yamuna River, Village- Sadimadanpur, (Gata No.- Part… — cleared for impact study, 0 m away
- Sand/morrum Mine from Riverbed of Yamuna River, Village- Sadimadanpur, (Gata… — more information requested, 450 m away
- Sand/morrum Mine from Riverbed of Yamuna River, Village- Sadimadanpur, (Gata… — cleared for impact study, 450 m away
- Sand/Morrum Mine from Riverbed of Yamuna River — lapsed, 650 m away
- Sand/Morrum Mining project — lapsed, 850 m away
- Sand/Morrum Mining project — cleared for impact study, 850 m away
- Riverbed Sand Mine from Yamuna River (Private Land), Village- Sadi Madanpur… — environmental approval granted, 1 km away
More from Ashok Kumar in Banda
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Lahureta, Gata No.-… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.