Quick answers
What is this project?
"Sand/Morrum Mine" from Riverbed of Ken River, Village- Lahureta, Gata No.- Part of 195/1, 191 & 3, lease area- 33.00 Ha. (81.54 Acres), Tehsil- Naraini, District- Banda, Uttar Pradesh, Project Proponent- M/s A. S. Traders (Prop.- Shri Ashok Kumar) is a proposed mining project in Lahureta, Naraini, Banda, Uttar Pradesh. The site covers 81.5 acres.
Who is building it?
The applicant is Ashok Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Lahureta, Naraini, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 81.5 acres.
When was it filed?
The application was filed on 17 Sept 2025.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 4 Nov 2026 |
| Application filed | 17 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ashok Kumar |
| Land area | 81.5 acres (33 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Lahureta |
| Taluk / tehsil | Naraini |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03476 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 81.5 acres, this one is larger than 95% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Lahureta, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mining — lapsed, 900 m away
- Proposed "Removal of Morrum on Agriculture Land Project" of Shri Hari Mohan… — initial checks, 1.2 km away
- "Morrum Mining" at Village- Lahureta, Gata No.- 549, 551, 549MI, Lease Area-… — under environmental review, 1.2 km away
- Lahurehta Morrum Deposit Mining Project (Area 1.40 Ha.) — under environmental review, 1.3 km away
- "Morrum Mining" at Village- Barsandamanpur, Gata No.- 478, 479, 480, 481,… — more information requested, 4.5 km away
- Proposed riverbed sand/morrum mining project from Ranj River of M/s Victor… — initial checks, 6 km away
- Proposed riverbed sand/morrum mining project from Ranj River of M/s Victor… — under environmental review, 6 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — in-principle approval, conditions pending, 6.8 km away
More from Ashok Kumar in Banda
- Riverbed Sand Mine from Yamuna River, Village- Sadimadanpur, (Gata No.- Part… — returned to applicant
- Riverbed Sand Mine from Yamuna River, Village- Sadimadanpur, (Gata No.- Part… — environmental approval granted
- Riverbed Sand Mine from Yamuna River, Village- Sadimadanpur, (Gata No.- Part… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.