What is Developing? Open the mapMap

Environmental approval grantedMining · Ayodhya, Uttar Pradesh

"Ordinary Sand Mining" from Riverbed of Ghaghra River

"Ordinary Sand Mining" from Riverbed of Ghaghra River is an approved mining project in Meerapur Dwaba Uparhar, Faizabad, Ayodhya, Uttar Pradesh. The site covers 5.9 acres. Its stated project cost is ₹75 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 15 Nov 2024).

See it on the live map All projects in Ayodhya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Ordinary Sand Mining" from Riverbed of Ghaghra River?

"Ordinary Sand Mining" from Riverbed of Ghaghra River is an approved mining project in Meerapur Dwaba Uparhar, Faizabad, Ayodhya, Uttar Pradesh. The site covers 5.9 acres.

Who is building it?

The applicant is Bansu Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 15 Nov 2024), as of 27 Nov 2026.

Where is it?

In Meerapur Dwaba Uparhar, Faizabad, Ayodhya, Uttar Pradesh.

How big is it?

It has a stated cost of ₹75 lakh and a site of 5.9 acres.

When was it filed?

The application was filed on 29 Apr 2024.

Project details

Official title"Ordinary Sand Mining" from Riverbed of Ghaghra River at Village- Meerapur Doaba, Gata No.- 1ल, Lease Area- 2.400 ha., Tehsil- Sadar, District- Ayodhya, Uttar Pradesh, Project Proponent- M/s Adhyatm Construction (Prop. Smt Bansu Singh)
StatusEnvironmental approval granted
Status since15 Nov 2024
Application filed29 Apr 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantBansu Singh
Land area5.9 acres (2.4 ha)
Project cost₹75 lakh
Village / localityMeerapur Dwaba Uparhar
Taluk / tehsilFaizabad
DistrictAyodhya
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02466

In context

57 applications in Ayodhya since January 2022 are in the same category (Mining): 42 approved, 13 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.9 acres, this one is larger than 58% of them.

No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.

Where it is

Meerapur Dwaba Uparhar, Faizabad, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bansu Singh in Ayodhya

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.