Quick answers
What is this project?
Proposed project of Riverbed of Ghaghra River Ordinary Sand Mining at Gata No. 1 La, Area 2.4000 ha is a proposed mining project in Meerapur Dwaba Manjha, Faizabad, Ayodhya, Uttar Pradesh. The site covers 5.9 acres.
Who is building it?
The applicant is Radheshyam Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Meerapur Dwaba Manjha, Faizabad, Ayodhya, Uttar Pradesh.
How big is it?
It has a stated cost of ₹45 lakh and a site of 5.9 acres.
When was it filed?
The application was filed on 28 Jul 2026.
Project details
| Official title | Proposed project of Riverbed of Ghaghra River Ordinary Sand Mining at Gata No. 1 La, Area 2.4000 ha in Village- Meerapur Dwaba, Tehsil- Sadar, District- Ayodhya, Uttar Pradesh of M/s Mahakal Traders, Prop. Shri Radheshyam Singh |
|---|---|
| Status | Under environmental review |
| Status since | 24 Aug 2026 |
| Application filed | 28 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Radheshyam Singh |
| Land area | 5.9 acres (2.4 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Meerapur Dwaba Manjha |
| Taluk / tehsil | Faizabad |
| District | Ayodhya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04405 |
In context
57 applications in Ayodhya since January 2022 are in the same category (Mining): 42 approved, 13 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.9 acres, this one is larger than 58% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Meerapur Dwaba Manjha, Faizabad, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" from Riverbed of Ghaghra River — environmental approval granted, 0 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — environmental approval granted, 650 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — cleared for impact study, 650 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — more information requested, 700 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — cleared for impact study, 700 m away
- Ordinary Sand Mine — environmental approval granted, 750 m away
- Ordinary Sand Mine — cleared for impact study, 750 m away
- River Bed Sand/Morrum Mining Project of Shri Gyanchand Jaiswal Village -… — returned to applicant, 1.1 km away
More from Radheshyam Singh in Ayodhya
- "Ordinary Earth Mine", Village- Manjhamudadiha, Faizabad, Gata No.- 1K, 2, 3,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.