Quick answers
What is Building Stone or Khanda, Gitti, Boulder, Mining Project?
Building Stone or Khanda, Gitti, Boulder, Mining Project is a lapsed mining project in Goramachhiya, Jhansi, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Meera Yadav.
Has it been approved?
No. The application was lapsed on 28 Oct 2026, so it is no longer under consideration.
Where is it?
In Goramachhiya, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹81 lakh and a site of 3 acres.
When was it filed?
The application was filed on 22 Apr 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Building Stone or Khanda, Gitti, Boulder, Mining Project
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Oct 2026 |
| Application filed | 22 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Meera Yadav |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹81 lakh |
| Village / locality | Goramachhiya |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02528 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 28 Oct 2025 | Lapsed | 3.4 acres | ₹97 lakh |
| Early planning filed 22 Apr 2025 (this page) | Lapsed | 3 acres | ₹81 lakh |
| Early planning filed 22 Apr 2025 | Lapsed | 3 acres | ₹82 lakh |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 86% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 23 mining leases have applied within 5 km.
Where it is
Goramachhiya, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone or Khanda, Gitti, Boulder, Mining Project — lapsed, 100 m away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — cleared for impact study, 100 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 100 m away
- Building Stone (Granite) or Khanda, Boulder, Gitti, Ballast Mining Project — under environmental review, 200 m away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — cleared for impact study, 450 m away
- Building Stone (Granite) or Khanda, Boulder, Gitti, Ballast Mining — under environmental review, 600 m away
- Building Stone (Granite) or Khanda, Boulder, Gitti, Ballast Mining — cleared for impact study, 600 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.