Quick answers
What is this project?
Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project is a proposed mining project in Goramachhiya, Jhansi, Uttar Pradesh. The site covers 3.5 acres.
Who is building it?
The applicant is Bhawna Yadav.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 15 Jan 2026), as of 27 Nov 2026.
Where is it?
In Goramachhiya, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹99 lakh and a site of 3.5 acres.
When was it filed?
The application was filed on 27 Oct 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 15 Jan 2026 |
| Application filed | 27 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Bhawna Yadav |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹99 lakh |
| Village / locality | Goramachhiya |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02896 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.5 acres, this one is smaller than 77% of them.
No other mining lease on record is within 500 m of this site; 23 have applied within 5 km.
Where it is
Goramachhiya, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone or Khanda, Gitti, Boulder, Mining Project — lapsed, 100 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 150 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — lapsed, 200 m away
- Building Stone (Granite) or Khanda, Boulder, Gitti, Ballast Mining Project — under environmental review, 200 m away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — cleared for impact study, 350 m away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — cleared for impact study, 550 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 550 m away
- Building Stone (Granite) or Khanda, Boulder, Gitti, Ballast Mining — under environmental review, 550 m away