Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Jun 2024 |
| Application filed | 20 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Satya Pandey |
| Use | Commercial |
| Floors (tallest) | 4 |
| Basements | 3 |
| Parking spaces | 920 |
| Land area | 3.6 acres (1.5 ha) |
| Built-up area | 52,118 m² (5,60,993 sq ft) |
| Plot area | 14,516 m² (1,56,249 sq ft) |
| Project cost | ₹106 crore |
| Village / locality | Aitha |
| Taluk / tehsil | Sadar |
| District | Varanasi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02535 |
In context
45 applications in Varanasi since January 2022 are in the same category (Buildings & townships): 30 approved, 13 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.6 acres, this one is larger than 69% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aitha, Sadar, Varanasi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Varuna Elevated Corridor: A ₹10,998-Crore Highway in Varanasi (5.3 km away).
Other projects nearby
- Proposed Apollomedics Hospital in Varanasi, Uttar Pradesh — environmental approval granted, 600 m away
- Proposed Group Housing Cum Service Apartments for M/s. JHV Sahakari Awas… — under environmental review, 1000 m away
- Laxmi Singh Residency by Devbhumi Infra Developers — under environmental review, 3.7 km away
- Autonomous State Medical College — environmental approval granted, 4 km away
- Proposed Strengthening & Remodeling Work of Deen Dayal Upadhyay Hospital… — environmental approval granted, 4.3 km away
- 192 Type-B Quarters for Police Personnel of P. S. Chetganj, Shivpur & Cantt.… — environmental approval granted, 4.4 km away
- Proposed Group Housing Project by Shri Maharani Infradevelopers Private Limited — initial checks, 4.7 km away
- Commercial cum Integrated office complex at Commissioner's compound,… — environmental approval granted, 4.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.