Project details
| Official title | Proposed "Ordinary Soil Excavation" Project at Area: 2.265 Ha. "Ordinary Soil Excavation" Project at Gata No.– 1128/2, 1155, 1150/2, 1138/1, 1151/2, 1129 & 1126 Mi in Village - Bhaipur, Tehsil- Thakurdwara & District- Moradabad, Uttar Pradesh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 25 Feb 2026 |
| Application filed | 27 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pushpendar Singh |
| Land area | 5.6 acres (2.3 ha) |
| Project cost | ₹13 lakh |
| Village / locality | Bhaipur |
| Taluk / tehsil | Thakurdwara |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02548 |
In context
38 applications in Moradabad since January 2022 are in the same category (Mining): 33 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 5.6 acres, this one is larger than 71% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Bhaipur, Thakurdwara, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Ordinary Soil Project at at Gata No.–16 & 72 — environmental approval granted, 1.3 km away
- जनपद मुरादाबाद में लोक निर्माण अनुभाग-10 उत्तर प्रदेश शासन के शासनादेश… — in-principle approval, conditions pending, 1.7 km away
- Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — in-principle approval, conditions pending, 1.8 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 3.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 5.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 5.5 km away
- C or B HEAVY MOLASSES / CANE JUICE SYRUP/ GRAIN BASED DISTILLERY HAVING… — initial checks, 10.4 km away
- C or B HEAVY MOLASSES / CANE JUICE SYRUP/ GRAIN BASED DISTILLERY HAVING… — cleared for impact study, 10.4 km away
More from Pushpendar Singh in Moradabad
- Proposed Ordinary Soil Project at at Gata No.–16 & 72 — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.