Quick answers
What is Ahmadpur Nigunagla Soil Mining Project?
Ahmadpur Nigunagla Soil Mining Project is an approved mining project in Ahmadpur Nigu, Kanth, Amroha, Uttar Pradesh. The site covers 3.3 acres.
Who is building it?
The applicant is Ravindra Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 May 2026), as of 27 Nov 2026.
Where is it?
In Ahmadpur Nigu, Kanth, Amroha, Uttar Pradesh.
How big is it?
It has a stated cost of ₹10 lakh and a site of 3.3 acres.
When was it filed?
The application was filed on 4 Nov 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 May 2026 |
| Application filed | 4 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ravindra Singh |
| Land area | 3.3 acres (1.3 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Ahmadpur Nigu |
| Taluk / tehsil | Kanth |
| District | Amroha |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02572 |
In context
38 applications in Amroha since January 2022 are in the same category (Mining): 27 approved, 11 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.3 acres, this one is smaller than 66% of them.
No other mining lease on record is within 500 m of this site; 15 have applied within 5 km.
Where it is
Ahmadpur Nigu, Kanth, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Earth Mine, Village- Khalilpur Kadim, Tehsil- Kanth, District-… — environmental approval granted, 1.6 km away
- Badaudi fatehullapur Soil Mining Project — environmental approval granted, 1.6 km away
- Badaudi Fatehullapur Soil Mining Project — environmental approval granted, 1.6 km away
- Badaudi Soil Mining Project — under environmental review, 1.6 km away
- Area: 0.844 Ha. "Ordinary Soil Excavation" Project at Gata No.– 656मि, 710मि,… — environmental approval granted, 1.7 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 1.8 km away
- Khaleelpur Kadeem Soil Mining Project — under environmental review, 2.1 km away
- Proposed "Ordinary Soil Excavation" Project at Area: 2.197 Ha. "Ordinary Soil… — more information requested, 2.2 km away
More from Ravindra Singh in Amroha