Quick answers
What is Deeppur Soil Mining Project?
Deeppur Soil Mining Project is an approved mining project in Dippur, Amroha, Uttar Pradesh. The site covers 6.8 acres.
Who is building it?
The applicant is Ravindra Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Oct 2026), as of 27 Nov 2026.
Where is it?
In Dippur, Amroha, Uttar Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 6.8 acres.
When was it filed?
The application was filed on 16 May 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Oct 2026 |
| Application filed | 16 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ravindra Singh |
| Land area | 6.8 acres (2.8 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Dippur |
| Taluk / tehsil | Amroha |
| District | Amroha |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04240 |
In context
38 applications in Amroha since January 2022 are in the same category (Mining): 27 approved, 11 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.8 acres, this one is larger than 84% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Dippur, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 2.5 km away
- Granting of permission for Construction of Access to the Proposed CNG Station… — forest land use approved, 4.3 km away
- Ordinary Soil Mining Project — environmental approval granted, 5.4 km away
- Ordinary Soil Mine — under environmental review, 5.5 km away
- Ordinary Soil Mine — under environmental review, 5.9 km away
- Proposed IOCL Retail Outlet at Delhi-Moradabad Road NH-09 (Old NH-24) KM-134… — lapsed, 6 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 7.7 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 7.7 km away
More from Ravindra Singh in Amroha
- Ahmadpur Nigunagla Soil Mining Project — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.