One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of existing Sugar unit from 7500 TCD to 10,000 TCD and without change in…
Project details
| Official title | Expansion of existing Sugar unit from 7500 TCD to 10,000 TCD and without change in Co-gen power capacity 18 MW within existing industry premises at Village: Haripur, Kodar Chak & Ravan Deeh, Post: Mijhuara, Tehsil: Akbarpur, District: Ambedkar Nagar, Uttar Pradesh by M/s Balrampur Chini Mills Ltd, Unit: Akbarpur, Division: Sugar |
|---|---|
| Status | Under environmental review |
| Status since | 5 Oct 2026 |
| Application filed | 20 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Balrampur Chini Mills LTD |
| Land area | 74.1 acres (30 ha) |
| Project cost | ₹750 crore |
| Village / locality | Haripur |
| Taluk / tehsil | Bhiti |
| District | Ambedkar Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02623 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 6 Oct 2026 | Under environmental review | 74.1 acres | ₹750 crore |
| Early planning filed 20 Sept 2025 (this page) | Under environmental review | 74.1 acres | ₹750 crore |
In context
5 applications in Ambedkar Nagar since January 2022 are in the same category (Industry): 3 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected.
Where it is
Haripur, Bhiti, Ambedkar Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Sugar unit from 7500 TCD to 10,000 TCD and without… — under environmental review, 0 m away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 6.1 km away
- Proposed IOCL Retail Outlet on Bahraich-Faizabad-Azamgarh Road (SH-30) in Km.… — forest land use approved, 6.4 km away
- Proposed Exit/Entry to to IOCL Retail Outlet on Bahraich-Faizabad-Azamgarh… — lapsed, 6.4 km away
- Diversion of Protected Forest Land Proposed For Diversion For Entry/Exit… — in-principle approval, conditions pending, 8.8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 10.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — lapsed, 10.6 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — lapsed, 11.7 km away
All 16 Balrampur Chini Mills projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.