Quick answers
What is this project?
proposed "Soil Excavation Project" at Gata No. 930, 941, 937, 922 & 928, Mining Lease Area 1.037 ha, Village- Sarosi, Tehsil- Unnao, District Unnao, Uttar Pradesh,Proprietor- Shri Aman Dwivedi,Area 1.037 ha is an approved mining project in Sarosi, Unnao, Uttar Pradesh. The site covers 2.6 acres.
Who is building it?
The applicant is Aman Dwivedi.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Jun 2025), as of 27 Nov 2026.
Where is it?
In Sarosi, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 2.6 acres.
When was it filed?
The application was filed on 30 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Jun 2025 |
| Application filed | 30 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Aman Dwivedi |
| Land area | 2.6 acres (1 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Sarosi |
| Taluk / tehsil | Unnao |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02639 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.6 acres, this one is larger than 51% of them.
6 other mining leases have applied within 500 m of this site; together with this one they cover 17.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 12 mining leases have applied within 5 km.
Where it is
Sarosi, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Ordinary Soil Excavation Project" at Gata No. 923, 926, 932, 927,… — environmental approval granted, 50 m away
- Ordinary Soil Excavation Project at Gata No.- 433, 498, 953, 954, 955, 957,… — under environmental review, 200 m away
- "Ordinary Soil Excavation Project" at Gata No. 543, 544, 545, 541, 528, 538,… — environmental approval granted, 250 m away
- "Ordinary Soil Excavation Project" at Gata No.- 1583, 1582, Village- Sarosi,… — environmental approval granted, 250 m away
- Environmental Clearance for Ordinary Soil Excavation Project at Gata No: 1507,… — initial checks, 250 m away
- Proposed "Ordinary Soil Mining Project" at Gata 504, 514, 207, 517 & 535 by… — under environmental review, 350 m away
- "Ordinary Soil Excavation Project" at Gata No.- 1286, 1287, 1290, 1304, 1305,… — environmental approval granted, 650 m away
- Ordinary Earth Mining Project. — environmental approval granted, 1.1 km away
More from Aman Dwivedi in Unnao
- "Ordinary Soil Mining Project" at Gata 378 & 363 — environmental approval granted
- "Ordinary Soil Excavation Project" at Gata No. 543, 544, 545, 541, 528, 538,… — environmental approval granted
- Ordinary Earth Mining Project at Gata No.- 363, 373 & 377, Village- Bhainshi… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.