Quick answers
What is this project?
Ordinary Earth Mining Project at Gata No.- 363, 373 & 377, Village- Bhainshi Naubasta, Tehsil- Unnao, District- Unnao, U.P. Total Area: 1.2615 Ha is an approved mining project in Bhainsali Naubasta, Unnao, Uttar Pradesh. The site covers 1.1 acres.
Who is building it?
The applicant is Aman Dwivedi.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Aug 2023), as of 27 Nov 2026.
Where is it?
In Bhainsali Naubasta, Unnao, Uttar Pradesh.
How big is it?
It has a site of 1.1 acres.
When was it filed?
The application was filed on 11 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Aug 2023 |
| Application filed | 11 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Aman Dwivedi |
| Land area | 1.1 acres (0.4 ha) |
| Village / locality | Bhainsali Naubasta |
| Taluk / tehsil | Unnao |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00459 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.1 acres, this one is smaller than 96% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 4.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Bhainsali Naubasta, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Mining Project" at Gata 378 & 363 — environmental approval granted, 500 m away
- Ordinary Earth Mining Project (Gata No.-378, 359 Village:Bhainsai Naubasta,… — under environmental review, 600 m away
- Ordinary Soil Mine — under environmental review, 4.2 km away
- Ordinary Earth Mining Project Gata No.- 2490, 2678, 2507 Village:Bahurajmau,… — environmental approval granted, 5.2 km away
- Last Mile Connecting of GAIL RR-51 Station to M/s Green Gas Limited Station — lapsed, 6.5 km away
- Ordinary Soil Excavation Project — environmental approval granted, 6.5 km away
- Proposal of re-diversion for Jio Digital Fibre Private Limited Project for… — in-principle approval, conditions pending, 6.7 km away
- "Ordinary Soil Excavation Mining" Project at Gata No.- 43, Village- Hadha,… — environmental approval granted, 8 km away
More from Aman Dwivedi in Unnao
- "Ordinary Soil Mining Project" at Gata 378 & 363 — environmental approval granted
- proposed "Soil Excavation Project" at Gata No. 930, 941, 937, 922 & 928,… — environmental approval granted
- "Ordinary Soil Excavation Project" at Gata No. 543, 544, 545, 541, 528, 538,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.