Quick answers
What is this project?
Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 2101/2 (Khand No.-06), Village- Sijahri, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 1.214 ha.), M/s Ganesh Granite, Prop.- Shri Sanjay Kumar Sahu S/o Shri Chhanga Prasad Sahu is a proposed mining project in Sijahri, Mahoba, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Sanjay Kumar Sahu.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Jul 2026), as of 27 Nov 2026.
Where is it?
In Sijahri, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹68 lakh and a site of 3 acres.
When was it filed?
The application was filed on 4 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 2101/2 (Khand No.-06),…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Jul 2026 |
| Application filed | 4 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sanjay Kumar Sahu |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹68 lakh |
| Village / locality | Sijahri |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02642 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Jul 2026 | Environmental approval granted | 3 acres | ₹68 lakh |
| Early planning filed 4 Sept 2025 (this page) | Cleared for impact study | 3 acres | ₹68 lakh |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 59% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 12.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Sijahri, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 2101/2… — environmental approval granted, 0 m away
- "Building Stone as (Khanda, Boulders, Gitti) Mining Project" located at Gata… — initial checks, 50 m away
- "Building Stone as (Khanda, Boulders, Gitti) Mining Project" located at Gata… — cleared for impact study, 50 m away
- Proposed Project of "Building Stone Khanda, Boulders, (Gitti) Mining Project"… — cleared for impact study, 150 m away
- "Building Stone (Khanda, Gitti & Boulder)" Project at Gata No.- 2101/2 Khand… — environmental approval granted, 200 m away
- "Building Stone (Khanda, Gitti & Boulder)" Project at Gata No.- 2101/2 Khand… — cleared for impact study, 200 m away
- 200 Bedded Hospital and Trauma Center — environmental approval granted, 3.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 3.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.