Quick answers
What is this project?
Proposed Project of "Building Stone Khanda, Boulders, (Gitti) Mining Project" located at Gata No. 2101/2 (Khand No.- 04 new), Area- 1.4174 ha is a proposed mining project in Sijahri, Mahoba, Uttar Pradesh. The site covers 3.5 acres.
Who is building it?
The applicant is Randhir Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Apr 2025), as of 27 Nov 2026.
Where is it?
In Sijahri, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹99 lakh and a site of 3.5 acres.
When was it filed?
The application was filed on 10 Feb 2025.
Project details
| Official title | Proposed Project of "Building Stone Khanda, Boulders, (Gitti) Mining Project" located at Gata No. 2101/2 (Khand No.- 04 new), Area- 1.4174 ha. in Village- Sijahri, Tehsil- Sadar & District- Mahoba, Uttar Pradesh,Proponent- Shri Randheer Singh |
|---|---|
| Status | Cleared for impact study |
| Status since | 29 Apr 2025 |
| Application filed | 10 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Randhir Singh |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹99 lakh |
| Village / locality | Sijahri |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02696 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.5 acres, this one is larger than 59% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 12.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Sijahri, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone as (Khanda, Boulders, Gitti) Mining Project" located at Gata… — initial checks, 100 m away
- "Building Stone as (Khanda, Boulders, Gitti) Mining Project" located at Gata… — cleared for impact study, 100 m away
- Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 2101/2… — environmental approval granted, 150 m away
- Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 2101/2… — cleared for impact study, 150 m away
- "Building Stone (Khanda, Gitti & Boulder)" Project at Gata No.- 2101/2 Khand… — environmental approval granted, 150 m away
- "Building Stone (Khanda, Gitti & Boulder)" Project at Gata No.- 2101/2 Khand… — cleared for impact study, 150 m away
- 200 Bedded Hospital and Trauma Center — environmental approval granted, 3.2 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 3.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.