Quick answers
What is this project?
Environmental clearance of proposed ordinary soil mining at Khasra/Gata Nos. 206, 213 ka, 242, 244, 407 and 412 Area – 4.517 ha is an approved mining project in Ahraula Mafi, Sambhal, Uttar Pradesh. The site covers 11.2 acres.
Who is building it?
The applicant is Mahesh Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Dec 2025), as of 27 Nov 2026.
Where is it?
In Ahraula Mafi, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹17 lakh and a site of 11.2 acres.
When was it filed?
The application was filed on 5 Sept 2025.
Project details
| Official title | Environmental clearance of proposed ordinary soil mining at Khasra/Gata Nos. 206, 213 ka, 242, 244, 407 and 412 Area – 4.517 ha at Village- Ahrola - mafi, Tehsil and District - Sambhal, Uttar Pradesh of Shri Mahesh Kumar |
|---|---|
| Status | Environmental approval granted |
| Status since | 19 Dec 2025 |
| Application filed | 5 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mahesh Kumar |
| Land area | 11.2 acres (4.5 ha) |
| Project cost | ₹17 lakh |
| Village / locality | Ahraula Mafi |
| Taluk / tehsil | Sambhal |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02646 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11.2 acres, this one is larger than 92% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Ahraula Mafi, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Mining Project" at Gata No.- 230मि, 312, 270, Village- Shahpur… — more information requested, 800 m away
- "Ordinary Soil Mining" Project at Gata No.- 230मि, 311/1, 318, Village-… — more information requested, 800 m away
- Proposed "Ordinary Soil Mining Project" at Gata 311/1, 315, 316, 317, 318,… — under environmental review, 800 m away
- Environmental clearance of proposed ordinary soil mining at Gata Nos. 204,… — under environmental review, 1000 m away
- Ordinary soil mining at Khasra/Gata Nos. 292, 299mi, 324, 326mi, 328, 288mi,… — environmental approval granted, 1.1 km away
- Proposed "Ordinary Soil Excavation Mining Project" at Gata No. 337 Mining… — environmental approval granted, 1.5 km away
- Ordinary Soil Mining — initial checks, 2 km away
- Environmental clearance of proposed ordinary soil mining at Khasra/Gata Nos.… — environmental approval granted, 2.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.