Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Sept 2025 |
| Application filed | 25 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dev Bhattacharya |
| Land area | 3.6 acres (1.4 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Paharpur |
| Taluk / tehsil | Chakia |
| District | Chandauli |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02647 |
In context
11 applications in Chandauli since January 2022 are in the same category (Mining): 9 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.6 acres, this one is smaller than 82% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Paharpur, Chakia, Chandauli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Reserved Forest Land to be diverted for Road Widening at Bhabhora… — more information requested, 9.3 km away
- Vikas Khand Chakia Men Chakia Ahraura Road Se Shri Shri Mahasant Baiju Baba… — lapsed, 9.6 km away
- Musakhand Pumped Storage Project (600 MW) — lapsed, 10.8 km away
- Musakhand Closed Loop Pumped Storage Project (600 MW) by M/s ACME Urja Two… — lapsed, 11 km away
- Musakhand Pumped Storage Project (600 MW) — withdrawn, 11.2 km away
- Musakhand Pumped Storage Project (600 MW) — lapsed, 11.2 km away
- Musakhand Pumped Storage Project (600 MW) — cleared for impact study, 11.3 km away
- Musakhand Pumped Storage Project (600 MW) — lapsed, 11.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.