Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Mar 2026 |
| Application filed | 11 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Amba Shakti Steels Limited |
| Land area | 12 acres (4.9 ha) |
| Project cost | ₹198.1 crore |
| Village / locality | Jarauda (Majra) |
| Taluk / tehsil | Muzaffarnagar |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02659 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 11 Sept 2025 (this page) | Environmental approval granted | 12 acres | ₹198.1 crore |
| Early planning filed 2 Sept 2024 | Cleared for impact study | 12 acres | ₹198.1 crore |
In context
47 applications in Muzaffarnagar since January 2022 are in the same category (Industry): 30 approved, 5 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12 acres, this one is larger than 55% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jarauda (Majra), Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Terms of Reference application for the Environmental Clearance for the… — cleared for impact study, 0 m away
- Expansion of existing production capacity of MS ingot/MS Billet from 90720… — cleared for impact study, 0 m away
- Expansion of existing production capacity of MS ingot/MS Billet from 90720… — environmental approval granted, 0 m away
- Proposal Of Diversion Of 0.1974 ha.PF Land for Proposed Fuel Station Site Of… — lapsed, 400 m away
- Laying of Electrical Cable (132 KV U/G XLPE cables 630 Sq.mm (4 Nos) of M/s… — forest land use approved, 600 m away
- Environmental Clearance for regularization of existing Rolling Mill having… — lapsed, 1.1 km away
- Proposal of 0.1897 Ha Protected Forest Land to Be Diverted for Entry and Exit… — forest land use approved, 1.2 km away
- "Development of a New Township by M/s Numax Realcon Private Limited" on the… — returned to applicant, 1.6 km away
More from Amba Shakti Steels Limited in Muzaffarnagar
- Laying of Electrical Cable (132 KV U/G XLPE cables 630 Sq.mm (4 Nos) of M/s… — forest land use approved
- Expansion of existing production capacity of MS ingot/MS Billet from 90720… — cleared for impact study
- Expansion of existing production capacity of MS ingot/MS Billet from 90720… — environmental approval granted
All 5 Amba Shakti Steels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.