Project details
| Official title | Laying of Electrical Cable (132 KV U/G XLPE cables 630 Sq.mm (4 Nos) of M/s Amba Shakti Steels Limited from Km. 109.857 (RHS) to Km. 111.401 (RHS) (Total Length -1544 m) on NH-58 (New NH-344) (Delhi to Haridwar Road) at District –Muzaffarnagar in the state of Uttar Pradesh. |
|---|---|
| Status | Forest land use approved |
| Status since | 24 Apr 2025 |
| Application filed | 7 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Amba Shakti Steels Limited |
| Land area | 1,500 m² |
| Forest land | 1,540 m² |
| Project cost | ₹25 lakh |
| Village / locality | Jarauda (Majra) |
| Taluk / tehsil | Muzaffarnagar |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06543 |
In context
15 applications in Muzaffarnagar since January 2022 are in the same category (Roads & highways): 6 approved, 7 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.4 acres, this one is smaller than 92% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jarauda (Majra), Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Terms of Reference application for the Environmental Clearance for the… — environmental approval granted, 600 m away
- Terms of Reference application for the Environmental Clearance for the… — cleared for impact study, 600 m away
- Expansion of existing production capacity of MS ingot/MS Billet from 90720… — cleared for impact study, 600 m away
- Expansion of existing production capacity of MS ingot/MS Billet from 90720… — environmental approval granted, 600 m away
- Proposal Of Diversion Of 0.1974 ha.PF Land for Proposed Fuel Station Site Of… — lapsed, 850 m away
- "Development of a New Township by M/s Numax Realcon Private Limited" on the… — returned to applicant, 1.1 km away
- Environmental Clearance for regularization of existing Rolling Mill having… — lapsed, 1.7 km away
- Proposal of 0.1897 Ha Protected Forest Land to Be Diverted for Entry and Exit… — forest land use approved, 1.8 km away
More from Amba Shakti Steels Limited in Muzaffarnagar
- Terms of Reference application for the Environmental Clearance for the… — environmental approval granted
- Terms of Reference application for the Environmental Clearance for the… — cleared for impact study
- Expansion of existing production capacity of MS ingot/MS Billet from 90720… — cleared for impact study
- Expansion of existing production capacity of MS ingot/MS Billet from 90720… — environmental approval granted
All 5 Amba Shakti Steels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.