Quick answers
What is this project?
Proposed distillery unit of capacity 100 KLD (Grain Based) by M/s Namami Ganga Developers Pvt. Ltd is an approved industrial project in Sawan, Rasra, Ballia, Uttar Pradesh. The site covers 13.8 acres.
Who is building it?
The applicant is NAMAMIGANGA Developers PRIVATE LIMITED.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 May 2026), as of 27 Nov 2026.
Where is it?
In Sawan, Rasra, Ballia, Uttar Pradesh.
How big is it?
It has a stated cost of ₹141.3 crore and a site of 13.8 acres.
When was it filed?
The application was filed on 5 Nov 2025.
Project details
| Official title | Proposed distillery unit of capacity 100 KLD (Grain Based) along with 3.3 MW Co-gen power plant at village- Sawan, Tehsil- Rasra, District: Ballia Uttar Pradesh by M/s Namami Ganga Developers Pvt. Ltd |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 May 2026 |
| Application filed | 5 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | NAMAMIGANGA Developers PRIVATE LIMITED |
| Land area | 13.8 acres (5.6 ha) |
| Project cost | ₹141.3 crore |
| Village / locality | Sawan |
| Taluk / tehsil | Rasra |
| District | Ballia |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02725 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 18 Sept 2026 | Under environmental review | 13.8 acres | ₹141.3 crore |
| New project filed 5 Nov 2025 (this page) | Environmental approval granted | 13.8 acres | ₹141.3 crore |
| Early planning filed 14 Nov 2024 | Cleared for impact study | 13.8 acres | ₹141.3 crore |
Where it is
Sawan, Rasra, Ballia, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed distillery unit of capacity 100 KLD (Grain Based) by M/s Namami Ganga… — under environmental review, 0 m away
- Proposed distillery unit of capacity 100 KLD (Grain Based) by M/s Namami Ganga… — cleared for impact study, 0 m away
- Proposed Building/Road in the Premises of Jannayak Chandrashekhar University,… — more information requested, 18.5 km away
- Proposed Building/Road in the Premises of Jannayak Chandrashekhar University — more information requested, 18.5 km away
- 3d Seismic Survey for Hydrocarbon Exploration. — under wildlife review, 19.3 km away
- Widening & Strengthening to Two Lane with Paved Shoulder/Four Lane with paved… — forest land use approved, 19.8 km away
- Exploratory drilling of Two wells in OALP-VI BLOCK, GV-ONHP-2021/2 — environmental approval granted, 20.2 km away
- Four laning of Ghazipur–Balia new Greenfield Section: Starts by NHAI — under environmental review, 21.7 km away
All 3 NAMAMIGANGA Developers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.