Quick answers
What is 3d Seismic Survey for Hydrocarbon Exploration.?
3d Seismic Survey for Hydrocarbon Exploration is a proposed power project in Zirabasti, Ballia, Uttar Pradesh. The site covers 1,74,732.9 acres.
Who is building it?
The applicant is Krishan Gopal.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Zirabasti, Ballia, Uttar Pradesh.
How big is it?
It has a stated cost of ₹39.3 crore and a site of 1,74,732.9 acres.
When was it filed?
The application was filed on 27 Dec 2023.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 27 Dec 2023 |
| Application filed | 27 Dec 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Krishan Gopal |
| Land area | 1,74,732.9 acres (70,712 ha) |
| Project cost | ₹39.3 crore |
| Village / locality | Zirabasti |
| Taluk / tehsil | Ballia |
| District | Ballia |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07285 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Zirabasti, Ballia, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Exploratory drilling of Two wells in OALP-VI BLOCK, GV-ONHP-2021/2 — environmental approval granted, 1.7 km away
- Four laning of Ghazipur–Balia new Greenfield Section: Starts by NHAI — under environmental review, 5.4 km away
- Proposed Building/Road in the Premises of Jannayak Chandrashekhar University,… — more information requested, 9.3 km away
- Proposed Building/Road in the Premises of Jannayak Chandrashekhar University — more information requested, 9.4 km away
- Ordinary Sand Mining Project on River Bed of Ganges River — environmental approval granted, 16.9 km away
- Proposed distillery unit of capacity 100 KLD (Grain Based) by M/s Namami Ganga… — under environmental review, 19.3 km away
- Proposed distillery unit of capacity 100 KLD (Grain Based) by M/s Namami Ganga… — environmental approval granted, 19.3 km away
- Proposed distillery unit of capacity 100 KLD (Grain Based) by M/s Namami Ganga… — cleared for impact study, 19.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.