What is Developing? Open the mapMap

Cleared for impact studyMining · Mahoba, Uttar Pradesh

"Granite and Dolostone, Ballast, Gitti Mine" from Village- Utiyan, Gata/Arazi No.- 103, Lease Area- 1.2600 ha., Tehsil- Mahoba, District- Mahoba, Uttar Pradesh, Project Proponent - M/s G. D. Mining Pvt. Ltd.

"Granite and Dolostone, Ballast, Gitti Mine" from Village- Utiyan, Gata/Arazi No.- 103, Lease Area- 1.2600 ha., Tehsil- Mahoba, District- Mahoba, Uttar Pradesh, Project Proponent - M/s G. D. Mining Pvt. Ltd is a proposed mining project in Utiyan, Mahoba, Uttar Pradesh. The site covers 3.1 acres. Its stated project cost is ₹80 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 10 Jan 2026).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Granite and Dolostone, Ballast, Gitti Mine" from Village- Utiyan, Gata/Arazi No.- 103, Lease Area- 1.2600 ha., Tehsil- Mahoba, District- Mahoba, Uttar Pradesh, Project Proponent - M/s G. D. Mining Pvt. Ltd is a proposed mining project in Utiyan, Mahoba, Uttar Pradesh. The site covers 3.1 acres.

Who is building it?

The applicant is G D Mining Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 10 Jan 2026), as of 27 Nov 2026.

Where is it?

In Utiyan, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹80 lakh and a site of 3.1 acres.

When was it filed?

The application was filed on 20 Sept 2025.

Project details

StatusCleared for impact study
Status since10 Jan 2026
Application filed20 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantG D Mining Private Limited
Land area3.1 acres (1.3 ha)
Project cost₹80 lakh
Village / localityUtiyan
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02786

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.1 acres, this one is larger than 58% of them.

No other mining lease on record is within 500 m of this site; 42 have applied within 5 km.

Where it is

Utiyan, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from G D Mining Private Limited in Mahoba

All 33 G D Mining projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.