Quick answers
What is this project?
Transfer of Environmental Clearance of proposed project of Granite & Dolostone Ballast Gitti at Gata No.- 979 (Khand No.- 04), Village- Gahra, Tehsil- Mahoba, District- Mahoba, U.P. (Area- 1.1130 ha.) of M/s Brijraj Singh Contractor, Prop.- Shri Brijraj Singh S/o Shri Kuber Singh (earlier Lessee) in favor of Aaryasattva Private Limited, Additional Director- Shri Gurpreet Singh Saluja is an approved mining project in Gahra, Mahoba, Uttar Pradesh. The site covers 2.7 acres.
Who is building it?
The applicant is Aaryasattva Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Dec 2025), as of 27 Nov 2026.
Where is it?
In Gahra, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹63 lakh and a site of 2.7 acres.
When was it filed?
The application was filed on 5 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Dec 2025 |
| Application filed | 5 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Aaryasattva Private Limited |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹63 lakh |
| Village / locality | Gahra |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03777 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.7 acres, this one is smaller than 60% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 26.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 35 mining leases have applied within 5 km.
Where it is
Gahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Granite and Dolostone Ballast Gitti Mining Project" at Gata No./Khand: 979… — cleared for impact study, 150 m away
- Proposed Project of "Building Stone Khanda, Boulders, (Gitti) Mining Project"… — cleared for impact study, 150 m away
- Proposed Project of "Building Stone Khanda, Boulders, (Gitti) Mining Project"… — cleared for impact study, 250 m away
- "Granite and Dolostone Ballast Gitti Mining Project" at Gata No./Khand: 979… — under environmental review, 250 m away
- "Granite & Dolostone, Ballast (Gitty) Mining Project" — environmental approval granted, 1.7 km away
- "Granite and Dolostone, Ballast, Gitti Mine" from Village- Utiyan, Gata/Arazi… — cleared for impact study, 1.9 km away
- Building Stone As Granite Khanda, Gitti, Boulder Deposit — cleared for impact study, 3.4 km away
- Building Stone As Granite Khanda, Gitti, Boulder Deposit — environmental approval granted, 3.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.