Project details
| Official title | "Ordinary Earth Excavation Project" at Gata No. – 975, 993, 994, 995, 953 at Village- Neeva, Tehsil- Sarojini Nagar, District.- Lucknow of State- Uttar Pradesh, Area - 0.8995 ha. by M/s Jai Maa Sharda Constructions, Prop. Shri Shalendra Kumar Singh |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 May 2026 |
| Application filed | 27 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shalendra Kumar Singh |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Neewa |
| Taluk / tehsil | Sadar |
| District | Lucknow |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02792 |
In context
69 applications in Lucknow since January 2022 are in the same category (Mining): 61 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.2 acres, this one is smaller than 55% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Neewa, Sadar, Lucknow, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — lapsed, 850 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved, 1 km away
- Ordinary Soil Mine — initial checks, 2.9 km away
- "Ordinary Soil Mining Project" — environmental approval granted, 2.9 km away
- Expansion of Phase-II of Housing Scheme "ELDECO IMPERIA" at Khasra No. 119,… — environmental approval granted, 3.9 km away
- Proposed Expansion of Residential Township project "ELDECO IMPERIA" at Khasra… — environmental approval granted, 4 km away
- ITBP Approach Road at Village Kuroinee, Division Awadh Forest Division,… — lapsed, 4.2 km away
- ITBP Approach Road at Village Kuroinee, Division Awadh Forest Division,… — more information requested, 4.2 km away
More from Shalendra Kumar Singh in Lucknow
- Ordinary Soil Mine — initial checks
- Ordinary Earth Mining Project at Gata No. – 619 Mi & 619 Sann — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.