Project details
| Official title | Proposed Expansion of Residential Township project "ELDECO IMPERIA" at Khasra No.- 119,122,123,124,125,126,129, 131,138, 139,140,293SA,94,85,75,76,80,89,72, 73,84,92,90,91,86,93,82, 101,102,78,88,69,67,77,106SA,107SA, and 79 at Village - Jaitikhera, Pargana - Bijnaur, Tehsil- Sarojininagar, Lucknow, U.P., M/s Eldeco Housing and Industries Limited. |
|---|---|
| Status | Environmental approval granted |
| Status since | 7 Apr 2026 |
| Application filed | 6 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Eldeco Housing and Industries Limited |
| Use | Residential |
| Units | 137 |
| Floors (tallest) | 2 |
| Height | 7 m |
| Parking spaces | 137 |
| Land area | 45.2 acres (18.3 ha) |
| Built-up area | 93,701 m² (10,08,588 sq ft) |
| Plot area | 35,031 m² (3,77,070 sq ft) |
| Project cost | ₹203.1 crore |
| Village / locality | Jaitikhera |
| Taluk / tehsil | Sadar |
| District | Lucknow |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03555 |
In context
160 applications in Lucknow since January 2022 are in the same category (Buildings & townships): 105 approved, 38 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 45.2 acres, this one is larger than 81% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jaitikhera, Sadar, Lucknow, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Phase-II of Housing Scheme "ELDECO IMPERIA" at Khasra No. 119,… — environmental approval granted, 150 m away
- "Ordinary Earth Mining Project" — environmental approval granted, 1.9 km away
- Ordinary Soil Mine Project — environmental approval granted, 3.1 km away
- Greenfield, Access Controlled "Agra-Lucknow Expressway to Purvanchal… — cleared for impact study, 3.9 km away
- "Ordinary Earth Excavation Project" at Gata No. – 975, 993, 994, 995, 953 — environmental approval granted, 4 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — lapsed, 4.5 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved, 5 km away
- Expansion of proposed "Hi-Tech Township" by M/s Omaxe Garv Buildtech Pvt. Ltd — environmental approval granted, 5.3 km away
More from Eldeco Housing and Industries Limited in Lucknow
- Proposed Residential Plotted Development "Eldeco Namah" — under environmental review
- Proposed Mini Township — environmental approval granted
- Proposed Group Housing-02 at Udyan-2, Sector -IV, Raksha Khand, Sharda Nagar,… — environmental approval granted
- Expansion of Phase-II of Housing Scheme "ELDECO IMPERIA" at Khasra No. 119,… — environmental approval granted
5 Eldeco projects in Lucknow
All 28 Eldeco projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.