Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 May 2025 |
| Application filed | 24 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | M/S Uttar Pradesh State Industrial Development Authority |
| Use | Industrial |
| Land area | 912.8 acres (369.4 ha) |
| Built-up area | 20,000 m² (2,15,278 sq ft) |
| Plot area | 36,93,951 m² (3,97,61,319 sq ft) |
| Project cost | ₹466.9 crore |
| Village / locality | Bhera Pachpera |
| Taluk / tehsil | Pilibhit |
| District | Pilibhit |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-02849 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Jan 2025 (this page) | Environmental approval granted | 912.8 acres | ₹466.9 crore |
| Early planning filed 7 Mar 2024 | Cleared for impact study | 912.8 acres | ₹466.9 crore |
In context
5 applications in Pilibhit since January 2022 are in the same category (Buildings & townships): 2 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhera Pachpera, Pilibhit, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- UPSIDA Industrial Area — cleared for impact study, 0 m away
- Grain Based Ethanol Dstillery of Capacity 200 Kld by M/S Maa Sheetla Ventures… — cleared for impact study, 4.5 km away
- Proposed Grain Based Ethanol Distillery Capacity – 120 Kld — lapsed, 4.5 km away
- Ordinary Soil Mining Project — environmental approval granted, 6.3 km away
- Hasan Nagar Soil Mining Project — environmental approval granted, 7.2 km away
- Diversion of Protected Forest Land Proposed For Diversion For Entry/Exit… — initial checks, 9.2 km away
- Forest Land Proposed to be diverted to Connect the Pilibhit Bypass Road on… — forest land use approved, 15 km away
- "Ordinary Soil Mining" Project at Gata No.- 515, 550, 551, 555, Village-… — environmental approval granted, 15.7 km away
All 9 Uttar Pradesh State Industrial Development Authority projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.