Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 May 2026 |
| Application filed | 1 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vichitra Singh |
| Land area | 5.8 acres (2.3 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Hasannagar |
| Taluk / tehsil | Pilibhit |
| District | Pilibhit |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04333 |
In context
19 applications in Pilibhit since January 2022 are in the same category (Mining): 12 approved, 7 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.8 acres, this one is larger than 74% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Hasannagar, Pilibhit, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected Forest Land Proposed For Diversion For Entry/Exit… — initial checks, 5.1 km away
- UPSIDA Industrial Area — environmental approval granted, 7.2 km away
- UPSIDA Industrial Area — cleared for impact study, 7.2 km away
- Forest Land Proposed to be diverted to Connect the Pilibhit Bypass Road on… — forest land use approved, 7.9 km away
- "Ordinary Soil Mining" Project at Gata No.- 515, 550, 551, 555, Village-… — environmental approval granted, 8.9 km away
- Diversion of forest land 0.0970 Hect. for acess to the proposed Fuel Station… — forest land use approved, 10.2 km away
- Ordinary Soil Mining Project Form Gata No:, 297, 295, 616/1/2, 298, Area:… — under environmental review, 11.4 km away
- Grain Based Ethanol Dstillery of Capacity 200 Kld by M/S Maa Sheetla Ventures… — cleared for impact study, 11.7 km away
More from Vichitra Singh in Pilibhit
- Takia Dinarpur Soil Mining Projec — under environmental review
- Tulsipur Soil Mining Project — under environmental review
- Kheri Naubaramad Soil Mining Project — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.