Quick answers
What is this project?
"Ordinary Sand Mining" Project at Gata No.- 342, 343, 344, Village- Hotamgarhi Kham, Tehsil- Gunnaur District- Sambhal, U.P. (Area – 2.0400 ha). Smt. Rashmi Yadav is an approved mining project in Hotam Garhi Kham, Gunnaur, Sambhal, Uttar Pradesh. The site covers 5 acres.
Who is building it?
The applicant is Rashmi Yadav.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 May 2025), as of 27 Nov 2026.
Where is it?
In Hotam Garhi Kham, Gunnaur, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹28 lakh and a site of 5 acres.
When was it filed?
The application was filed on 20 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 May 2025 |
| Application filed | 20 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rashmi Yadav |
| Land area | 5 acres (2 ha) |
| Project cost | ₹28 lakh |
| Village / locality | Hotam Garhi Kham |
| Taluk / tehsil | Gunnaur |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02933 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5 acres, this one is smaller than 65% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Hotam Garhi Kham, Gunnaur, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Ordinary Sand Mining at Ganga River Bed Project" at Gata No. 711 Ka,… — lapsed, 1 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Bharat… — lapsed, 1.2 km away
- Proposed BPCL Retail Outlet — forest land use approved, 3.8 km away
- Amended BharatNet Project (Gunnaur-Sambhal) — lapsed, 7.9 km away
- Environmental Clearance of common Bio-medical Waste Treatment Facility (CBWTF)… — environmental approval granted, 10.2 km away
- Common Biomedical Waste Treatment Facility (CBWTF) proposed by M/s… — more information requested, 10.2 km away
- Amended BharatNet Project (Junawai-Sambhal) — lapsed, 10.6 km away
- Industrial project by Tata Chemicals limited — environmental approval granted, 11.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.