Quick answers
What is this project?
Proposed "Ordinary Sand Mining at Ganga River Bed Project" at Gata No. 711 Ka, Mining Lease Area 0.9400 Ha, Village- Ismapur Sailab Kham, Tehsil - Gunnaur, Pargana- Asadpur & District - Sambhal, Uttar Pradesh. Project Proponent-Sanjeev Kumar is a lapsed mining project in Isampur Sailab Kham, Gunnaur, Sambhal, Uttar Pradesh. The site covers 2.3 acres.
Who is building it?
The applicant is Sanjeev Kumar.
Has it been approved?
No. The application was lapsed on 30 Mar 2025, so it is no longer under consideration.
Where is it?
In Isampur Sailab Kham, Gunnaur, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 2.3 acres.
When was it filed?
The application was filed on 15 Jan 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Mar 2025 |
| Application filed | 15 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sanjeev Kumar |
| Land area | 2.3 acres (0.9 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Isampur Sailab Kham |
| Taluk / tehsil | Gunnaur |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03228 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.3 acres, this one is smaller than 88% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Isampur Sailab Kham, Gunnaur, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" Project at Gata No.- 342, 343, 344, Village- Hotamgarhi… — environmental approval granted, 1 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Bharat… — lapsed, 2.1 km away
- Proposed BPCL Retail Outlet — forest land use approved, 4.3 km away
- Amended BharatNet Project (Gunnaur-Sambhal) — lapsed, 8.7 km away
- Amended BharatNet Project (Junawai-Sambhal) — lapsed, 10 km away
- Environmental Clearance of common Bio-medical Waste Treatment Facility (CBWTF)… — environmental approval granted, 10.9 km away
- Common Biomedical Waste Treatment Facility (CBWTF) proposed by M/s… — more information requested, 10.9 km away
- Proposed BPCL Retail Outlet — forest land use approved, 11.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.