Quick answers
What is this project?
Building Stone (Khanda, Gitti, Boulders) Project at Gata No.- 721, Village- Daharra, Tehsil- Mahoba, District- Mahoba, U.P. (Leased Area- 0.647 ha./ 1.59 Acre), Lessee- Smt. Neeraj Yadav W/o Shri Chhatrapal Yadav is a proposed mining project in Daharra, Mahoba, Uttar Pradesh. The site covers 1.6 acres.
Who is building it?
The applicant is Neeraj Yadav.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Daharra, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹68 lakh and a site of 1.6 acres.
When was it filed?
The application was filed on 24 Dec 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Building Stone (Khanda, Gitti, Boulders) Project at Gata No.- 721, Village- Daharra,…
Project details
| Status | More information requested |
|---|---|
| Status since | 10 Oct 2026 |
| Application filed | 24 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Neeraj Yadav |
| Land area | 1.6 acres (0.7 ha) |
| Project cost | ₹68 lakh |
| Village / locality | Daharra |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02973 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Dec 2025 (this page) | More information requested | 1.6 acres | ₹68 lakh |
| Early planning filed 25 Jan 2025 | Cleared for impact study | 1.6 acres | ₹68 lakh |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.6 acres, this one is smaller than 90% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 11.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 36 mining leases have applied within 5 km.
Where it is
Daharra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.- 721, Village-… — cleared for impact study, 0 m away
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.- 735 Khand No.-… — more information requested, 100 m away
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.- 735 Khand No.-… — cleared for impact study, 100 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 250 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 250 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at… — environmental approval granted, 400 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at… — cleared for impact study, 400 m away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project… — environmental approval granted, 400 m away
More from Neeraj Yadav in Mahoba
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.