Environmental approval grantedMining · Mahoba, Uttar Pradesh

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 35, 34/2, Village- Damaura, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 1.849 ha.)

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 35, 34/2, Village- Damaura, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 1.849 ha.) is an approved mining project in Damaora, Mahoba, Uttar Pradesh. The site covers 4.6 acres. Its stated project cost is ₹69 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 16 Nov 2023).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 35, 34/2, Village- Damaura, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 1.849 ha.) is an approved mining project in Damaora, Mahoba, Uttar Pradesh. The site covers 4.6 acres.

Who is building it?

The applicant is Neeraj Yadav.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 16 Nov 2023), as of 27 Nov 2026.

Where is it?

In Damaora, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹69 lakh and a site of 4.6 acres.

When was it filed?

The application was filed on 16 Nov 2023.

Project details

StatusEnvironmental approval granted
Status since16 Nov 2023
Application filed16 Nov 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantNeeraj Yadav
Land area4.6 acres (1.9 ha)
Project cost₹69 lakh
Village / localityDamaora
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00980

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.6 acres, this one is larger than 70% of them.

No other mining lease on record is within 500 m of this site; 10 have applied within 5 km.

Where it is

Damaora, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.