Cleared for impact studyIndustry · Gorakhpur, Uttar Pradesh

Expansion of Integrated Steel Plant - Pellet Plant (7,92,000 TPA to 9,90,000 TPA), Sponge iron plant (6,60,000 TPA to 7,26,000 TPA), MS Billets (6,53,400 TPA to 8,00,250 TPA), Rolling mill (6,53,400 TPA to 7,85,000 TPA) & Captive power plant (80.5 MW to 120 MW) At Plot No.AL5, Sector-23, GIDA Industrial Area, Tehsil Sahjanwa, District Gorakhpur, U.P. by M/s. Gallantt Ispat Limited

Expansion of Integrated Steel Plant - Pellet Plant (7,92,000 TPA to 9,90,000 TPA), Sponge iron plant (6,60,000 TPA to 7,26,000 TPA), MS Billets (6,53,400 TPA to 8,00,250 TPA), Rolling mill (6,53,400 TPA to 7,85,000 TPA) & Captive power plant (80.5 MW to 120 MW) At Plot No.AL5, Sector-23, GIDA Industrial Area, Tehsil Sahjanwa, District Gorakhpur, U.P. by M/s. Gallantt Ispat Limited is a proposed industrial project in Rahimabad, Sahjanwa, Gorakhpur, Uttar Pradesh. The site covers 125.7 acres. Its stated project cost is ₹852.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 Sept 2025).

See it on the live map All projects in Gorakhpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Integrated Steel Plant - Pellet Plant (7,92,000 TPA to 9,90,000 TPA),…

Project details

StatusCleared for impact study
Status since6 Sept 2025
Application filed29 Jul 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantGallantt Ispat Limited
Land area125.7 acres (50.9 ha)
Project cost₹852.5 crore
Village / localityRahimabad
Taluk / tehsilSahjanwa
DistrictGorakhpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02986

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 9 Sept 2026Environmental approval granted125.7 acres₹852.5 crore
Early planning filed 29 Jul 2025 (this page)Cleared for impact study125.7 acres₹852.5 crore

In context

14 applications in Gorakhpur since January 2022 are in the same category (Industry): 13 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 125.7 acres, this one is larger than 64% of them.

14 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Rahimabad, Sahjanwa, Gorakhpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Gallantt Ispat Limited in Gorakhpur

3 Gallantt Ispat projects in Gorakhpur
All 5 Gallantt Ispat projects across India