Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Sept 2025 |
| Application filed | 8 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Siddharth Singh |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Sukrit |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03028 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 May 2025 (this page) | Environmental approval granted | 3.5 acres | ₹1.1 crore |
| Early planning filed 23 Mar 2023 | Cleared for impact study | 3.5 acres | ₹1.1 crore |
In context
209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.5 acres, this one is smaller than 60% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 23.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 29 mining leases have applied within 5 km.
Where it is
Sukrit, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone Gitti/Boulder (Sand Stone) located at Arazi No. – 310/4,… — cleared for impact study, 0 m away
- Area- 2.8328 Ha Gitti Boulder (Sandstone) Mining Project Araji no. 310/4,… — environmental approval granted, 100 m away
- Area- 2.8328 Ha Gitti Boulder (Sandstone) Mining Project Araji no. 310/4,… — cleared for impact study, 100 m away
- Building Stone As Gitti/Boulder (Sand Stone) Mining Project at Arazi No.… — cleared for impact study, 150 m away
- Building Stone As Gitti/Boulder (Sand Stone) Mining Project at Arazi No.… — environmental approval granted, 150 m away
- Proposed Project of "Gitty/Boulder (Sandstone) Mining Project" located at Gata… — environmental approval granted, 350 m away
- Proposed Project of "Gitty/Boulder (Sandstone) Mining Project" located at Gata… — cleared for impact study, 350 m away
- Building Stone Gitti/Boulder (Sand Stone) located at Arazi No. 282Mi,… — environmental approval granted, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.