What is Developing? Open the mapMap

Cleared for impact studyMining · Hamirpur, Uttar Pradesh

Sand/ Morrum Mining from Dhasan Riverbed

Sand/ Morrum Mining from Dhasan Riverbed is a proposed mining project in Jigni, Rath, Hamirpur, Uttar Pradesh. The site covers 37.8 acres. Its stated project cost is ₹2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 Oct 2025).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Sand/ Morrum Mining from Dhasan Riverbed?

Sand/ Morrum Mining from Dhasan Riverbed is a proposed mining project in Jigni, Rath, Hamirpur, Uttar Pradesh. The site covers 37.8 acres.

Who is building it?

The applicant is Sutra Construction and Suppliers.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 6 Oct 2025), as of 27 Nov 2026.

Where is it?

In Jigni, Rath, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹2 crore and a site of 37.8 acres.

When was it filed?

The application was filed on 22 May 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand/ Morrum Mining from Dhasan Riverbed

Project details

StatusCleared for impact study
Status since6 Oct 2025
Application filed22 May 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSutra Construction and Suppliers
Land area37.8 acres (15.3 ha)
Project cost₹2 crore
Village / localityJigni
Taluk / tehsilRath
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03121

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 22 Dec 2025Environmental approval granted37.8 acres₹2 crore
Early planning filed 22 May 2025 (this page)Cleared for impact study37.8 acres₹2 crore

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 37.8 acres, this one is smaller than 69% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Jigni, Rath, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sutra Construction and Suppliers in Hamirpur

All 3 Sutra Construction and projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.