Quick answers
What is this project?
Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River at Gata No. 780, 1271Gha, Khand No. 2, Area 20.00 ha is a proposed mining project in Jigni, Rath, Hamirpur, Uttar Pradesh. The site covers 49.4 acres.
Who is building it?
The applicant is Utsav Gupta.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Jigni, Rath, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹87 lakh and a site of 49.4 acres.
When was it filed?
The application was filed on 1 Apr 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River at Gata…
Project details
| Official title | Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River at Gata No. 780, 1271Gha, Khand No. 2, Area 20.00 ha in Village- Jigni, Tehsil- Rath, District- Hamirpur, Uttar Pradesh of M/s Anandeshwar Enterprises Pvt. Ltd., Director- Utsav Gupta |
|---|---|
| Status | Under environmental review |
| Status since | 13 Nov 2026 |
| Application filed | 1 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Utsav Gupta |
| Land area | 49.4 acres (20 ha) |
| Project cost | ₹87 lakh |
| Village / locality | Jigni |
| Taluk / tehsil | Rath |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04699 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Apr 2026 (this page) | Under environmental review | 49.4 acres | ₹87 lakh |
| Early planning filed 2 Jun 2025 | Cleared for impact study | 49.4 acres | ₹87 lakh |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 49.4 acres, this one is smaller than 53% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Jigni, Rath, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — cleared for impact study, 0 m away
- Proposed forest Land to be diverted for using Access passage to the Proposed… — more information requested, 2.4 km away
- Sand/ Morrum Mining from Dhasan Riverbed — environmental approval granted, 2.5 km away
- Sand/ Morrum Mining from Dhasan Riverbed — cleared for impact study, 2.5 km away
- "Sand/Morrum Mining" from Riverbed of Dhasan River — under environmental review, 3.1 km away
- "Sand/Morrum Mining" from Riverbed of Dhasan River — cleared for impact study, 3.1 km away
- Proposed Project of Sand/Morrum Mining from Riverbed of Dhasan River at Gata… — under environmental review, 3.2 km away
- Proposed Project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — withdrawn, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.