One of 2 filings for this project. The project's main page, with every filing and where each stands: Ordinary Sand Category-1 Mining from Yamuna Riverbed
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 May 2026 |
| Application filed | 24 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Suresh Kumar |
| Land area | 18 acres (7.3 ha) |
| Project cost | ₹2.6 crore |
| Village / locality | Badarpur |
| Taluk / tehsil | Ghaziabad |
| District | Ghaziabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03149 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Jun 2026 | Environmental approval granted | 18 acres | ₹2.6 crore |
| Early planning filed 24 Sept 2025 (this page) | Cleared for impact study | 18 acres | ₹2.6 crore |
In context
5 applications in Ghaziabad since January 2022 are in the same category (Mining): 5 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Badarpur, Ghaziabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Sand Category-1 Mining from Yamuna Riverbed — environmental approval granted, 0 m away
- Environmental Clearance for Integrated solid waste management facility — cleared for impact study, 2.7 km away
- Environmental Clearance for Integrated solid waste management facility — returned to applicant, 2.7 km away
- Sand mine, Gata No. 8mi, 9 mi, 10mi, 11mi, 12 mi, 13mi, 17mi, 18, 19, 20mi,… — cleared for impact study, 4.3 km away
- Pachayra Khand 1 Sand Mining Project — environmental approval granted, 4.3 km away
- Pachayra Khand 1 Sand Mining Project — cleared for impact study, 4.3 km away
- Capacity Expansion of Jamnagar-Loni Pipeline (JLPL) — under forest review, 9.9 km away
- Diversion of Forest land for new BPCL retail outlet at Khasra No. 23Mi,… — lapsed, 11.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.