One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for Integrated solid waste management facility
Project details
| Official title | Environmental Clearance for Integrated solid waste management facility at Village Meerpur Hindu, Loni, Uttar Pradesh |
|---|---|
| Status | Returned to applicant |
| Status since | 11 Feb 2025 |
| Application filed | 23 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Nagar Palika Parishad Loni |
| Land area | 19.8 acres (8 ha) |
| Project cost | ₹47.5 crore |
| Village / locality | Mirpur Hindu |
| Taluk / tehsil | Ghaziabad |
| District | Ghaziabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01406 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 12 Mar 2025 | Cleared for impact study | 19.8 acres | ₹47.5 crore |
| Early planning filed 23 Dec 2024 (this page) | Returned to applicant | 19.8 acres | ₹47.5 crore |
In context
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mirpur Hindu, Ghaziabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Integrated solid waste management facility — cleared for impact study, 0 m away
- Sand mine, Gata No. 8mi, 9 mi, 10mi, 11mi, 12 mi, 13mi, 17mi, 18, 19, 20mi,… — cleared for impact study, 2.5 km away
- Pachayra Khand 1 Sand Mining Project — environmental approval granted, 2.5 km away
- Pachayra Khand 1 Sand Mining Project — cleared for impact study, 2.5 km away
- Ordinary Sand Category-1 Mining from Yamuna Riverbed — environmental approval granted, 2.7 km away
- Ordinary Sand Category-1 Mining from Yamuna Riverbed — cleared for impact study, 2.7 km away
- Capacity Expansion of Jamnagar-Loni Pipeline (JLPL) — under forest review, 10.1 km away
- Amended Bharat Net Project ( Khekra - Baghpat section Meerut division) — lapsed, 10.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.