Quick answers
What is this project?
Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at Gata No. Part of 2/1 (Khand-1), over an area of 9.00 Hectares is a proposed mining project in Gaura Khadar, Baberu, Banda, Uttar Pradesh. The site covers 22.2 acres.
Who is building it?
The applicant is Aditya Chopra.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 May 2025), as of 27 Nov 2026.
Where is it?
In Gaura Khadar, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 22.2 acres.
When was it filed?
The application was filed on 8 Apr 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at Gata No.…
Project details
| Official title | Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at Gata No. Part of 2/1 (Khand-1), over an area of 9.00 Hectares situated in Village- Gaurakhadar, Tehsil- Baberu, District- Banda, Uttar Pradesh. M/s Euphoria Khanij Pvt. Ltd. Director-Shri Aditya Chopr,Area of 9.0. |
|---|---|
| Status | Cleared for impact study |
| Status since | 28 May 2025 |
| Application filed | 8 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Aditya Chopra |
| Land area | 22.2 acres (9 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Gaura Khadar |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03184 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Dec 2025 | Environmental approval granted | 22.2 acres | ₹90 lakh |
| Early planning filed 8 Apr 2025 (this page) | Cleared for impact study | 22.2 acres | ₹90 lakh |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 22.2 acres, this one is smaller than 71% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Gaura Khadar, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at… — environmental approval granted, 0 m away
- Proposed Project of "Sand/Morrum Mine" Gata No.- Part of 6/2 (Khand No.-4)… — under environmental review, 3.3 km away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at… — under environmental review, 3.6 km away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at… — cleared for impact study, 3.6 km away
- Proposed Project "Sand/Morrum Mining" at Gata No. Part of 6/2 (Khand-2), area-… — under environmental review, 3.9 km away
- Proposed Project "Sand/Morrum Mining" at Gata No. Part of 6/2 (Khand-1), area-… — under environmental review, 4.3 km away
- Proposed Project of "Sand/Morrum Mine" Gata No.- 2/4,2/23,2/24&2/28 (Khand… — under environmental review, 4.8 km away
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Anmol… — under environmental review, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.