Quick answers
What is this project?
Proposed riverbed sand/morrum mining project from Yamuna River of M/s Anmol Preetam Construction Prop.- Shri Preetam Singh S/o Shri Aniruddh Kumar, located at Gata No. 2/4, 2/23, 2/24 & 2/28 (Khand No.- 03), Village – Bendakhadar, Tehsil - Banda, District - Banda, Uttar Pradesh is a proposed mining project in Amlikaur, Banda, Uttar Pradesh. The site covers 51.9 acres.
Who is building it?
The applicant is Preetam Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Amlikaur, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹88 lakh and a site of 51.9 acres.
When was it filed?
The application was filed on 25 Sept 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 13 Nov 2026 |
| Application filed | 25 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Preetam Singh |
| Land area | 51.9 acres (21 ha) |
| Project cost | ₹88 lakh |
| Village / locality | Amlikaur |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04209 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 51.9 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Amlikaur, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "Sand/Morrum Mine" Gata No.- 2/4,2/23,2/24&2/28 (Khand… — under environmental review, 500 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 650 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study, 650 m away
- Proposed Project "Sand/Morrum Mining" at Gata No. Part of 6/2 (Khand-1), area-… — under environmental review, 1.1 km away
- Proposed Project of Sand/Morrum Mining from Riverbed of Yamuna River at Gata… — under environmental review, 1.3 km away
- Proposed Project "Sand/Morrum Mining" at Gata No. Part of 6/2 (Khand-2), area-… — under environmental review, 1.4 km away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at… — under environmental review, 1.8 km away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at… — cleared for impact study, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.