Quick answers
What is this project?
Expansion of Existing Distillery Capacity From 40 Kld to 50 Kld Due to Use of Alternative Feedstock As Grain Without Increase in Pollution Load is a proposed industrial building project in Abdullapur Munna, Bijnor, Uttar Pradesh. The site covers 17 acres.
Who is building it?
The applicant is Jain Distillery PVT LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Abdullapur Munna, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹30.3 crore and a site of 17 acres.
When was it filed?
The application was filed on 12 Jul 2025.
Project details
| Official title | Expansion of Existing Distillery Capacity From 40 Kld to 50 Kld Due to Use of Alternative Feedstock As Grain Without Increase in Pollution Load at Village – Abdulpur Munna Urf Hadarpur, Tehsil & District – Bijnor (Up) by M/S Jain Distillery (A Unit of Jain Distillery Private Limited) |
|---|---|
| Status | Initial checks |
| Status since | 12 Jul 2025 |
| Application filed | 12 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Jain Distillery PVT LTD |
| Use | Industrial |
| Land area | 17 acres (6.9 ha) |
| Project cost | ₹30.3 crore |
| Village / locality | Abdullapur Munna |
| Taluk / tehsil | Bijnor |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03264 |
In context
8 applications in Bijnor since January 2022 are in the same category (Buildings & townships): 1 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Abdullapur Munna, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- No Increase in Pollution Load Certificate for Proposed Expansion of Existing… — initial checks, 500 m away
- Proposed Protected Forest Land to be diverted for Laying of Natural Gas Pipe… — under forest review, 3.7 km away
- Proposed Protected Forest Land to be diverted (Forest Conservation Act 1980… — in-principle approval, conditions pending, 5.1 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 5.2 km away
- Proposed Protected Forest Land to be diverted (Forest Conservation Act 1980… — in-principle approval, conditions pending, 5.3 km away
- Proposed Forest Land For Laying Water Pipe Line Under Jal Jeevan Mission Phase — lapsed, 5.7 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 5.8 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed, 5.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.