What is Developing? Open the mapMap

Under forest reviewPipelines · Bijnor, Uttar Pradesh

Proposed Protected Forest Land to be diverted for Laying of Natural Gas Pipe Line along Bijnor Kotwali Existing road From Ch. 1.500 Km to 4.650 Km RHS for Total Approx 3.150 Km by HPCL

Proposed Protected Forest Land to be diverted for Laying of Natural Gas Pipe Line along Bijnor Kotwali Existing road From Ch. 1.500 Km to 4.650 Km RHS for Total Approx 3.150 Km by HPCL is a proposed pipeline project in Alampur Dihali, Bijnor, Uttar Pradesh. The site covers 0.4 acres. Its stated project cost is ₹30 lakh. As of 27 Nov 2026, its status is “Under forest review” (since 18 Nov 2026).

See it on the live map All projects in Bijnor

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Protected Forest Land to be diverted for Laying of Natural Gas Pipe Line along Bijnor Kotwali Existing road From Ch. 1.500 Km to 4.650 Km RHS for Total Approx 3.150 Km by HPCL is a proposed pipeline project in Alampur Dihali, Bijnor, Uttar Pradesh. The site covers 0.4 acres.

Who is building it?

The applicant is Hindustan Petroleum Corporation Limited (HPCL).

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Alampur Dihali, Bijnor, Uttar Pradesh.

How big is it?

It has a stated cost of ₹30 lakh; a site of 0.4 acres and 1,730 m² of forest land.

When was it filed?

The application was filed on 17 Sept 2026.

Project details

Official titleProposed Protected Forest Land to be diverted for Laying of Natural Gas Pipe Line along Bijnor Kotwali Existing road From Ch. 1.500 Km to 4.650 Km RHS for Total Approx 3.150 Km in District-Bijnor, Uttar Pradesh.
StatusUnder forest review
Status since18 Nov 2026
Application filed17 Sept 2026
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantHindustan Petroleum Corporation Limited (HPCL)
Land area1,700 m²
Forest land1,730 m²
Project cost₹30 lakh
Village / localityAlampur Dihali
Taluk / tehsilBijnor
DistrictBijnor
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05152

In context

7 applications in Bijnor since January 2022 are in the same category (Pipelines): 0 approved, 4 filed or under review, and 3 withdrawn, lapsed or rejected.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Alampur Dihali, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

10 Hindustan Petroleum Corporation (HPCL) projects in Bijnor
All 508 Hindustan Petroleum Corporation (HPCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.