What is Developing? Open the mapMap

Cleared for impact studyMining · Banda, Uttar Pradesh

"Sand/Morrum Mining" at Gata No. Part of 100 (Khand No.-03), area- 16 Ha., Village- Khaptiha Kalan, Tehsil- Pailani, District- Banda, Uttar Pradesh, M./s Amrit Phosphate Pvt. Ltd Director- Shri Trilok Singh Rathore

"Sand/Morrum Mining" at Gata No. Part of 100 (Khand No.-03), area- 16 Ha., Village- Khaptiha Kalan, Tehsil- Pailani, District- Banda, Uttar Pradesh, M./s Amrit Phosphate Pvt. Ltd Director- Shri Trilok Singh Rathore is a proposed mining project in Khaptla Kalan, Banda, Uttar Pradesh. The site covers 39.5 acres. Its stated project cost is ₹95 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 10 Jun 2025).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Sand/Morrum Mining" at Gata No. Part of 100 (Khand No.-03), area- 16 Ha., Village- Khaptiha Kalan, Tehsil- Pailani, District- Banda, Uttar Pradesh, M./s Amrit Phosphate Pvt. Ltd Director- Shri Trilok Singh Rathore is a proposed mining project in Khaptla Kalan, Banda, Uttar Pradesh. The site covers 39.5 acres.

Who is building it?

The applicant is Shrinanak Minerals Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 10 Jun 2025), as of 27 Nov 2026.

Where is it?

In Khaptla Kalan, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹95 lakh and a site of 39.5 acres.

When was it filed?

The application was filed on 9 May 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" at Gata No. Part of 100 (Khand No.-03), area- 16 Ha., Village-…

Project details

StatusCleared for impact study
Status since10 Jun 2025
Application filed9 May 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantShrinanak Minerals Private Limited
Land area39.5 acres (16 ha)
Project cost₹95 lakh
Village / localityKhaptla Kalan
Taluk / tehsilBanda
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03285

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 31 Oct 2025Environmental approval granted39.5 acres₹95 lakh
Early planning filed 9 May 2025 (this page)Cleared for impact study39.5 acres₹95 lakh

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 39.5 acres, this one is larger than 53% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 79.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.

Where it is

Khaptla Kalan, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shrinanak Minerals Private Limited in Banda

3 Shrinanak Minerals projects in Banda
All 19 Shrinanak Minerals projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.