Quick answers
What is this project?
Proposed Project "Sand/Morrum Mining" at Gata No. Part of 100 (Khand-1), Area- 16.0 Ha., Village- Khaptiha Kalan, Tehsil-Pailani, District- Banda, Uttar Pradesh. Euphoria Khanij Private Limited Director - Shri Chander Shekhar Chaurasia S/o- Shri D.D Chaurasia is a proposed mining project in Khaptla Kalan, Banda, Uttar Pradesh. The site covers 39.5 acres.
Who is building it?
The applicant is Euphoria Khanij Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Khaptla Kalan, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 39.5 acres.
When was it filed?
The application was filed on 14 Aug 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 23 Sept 2026 |
| Application filed | 14 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Euphoria Khanij Private Limited |
| Land area | 39.5 acres (16 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Khaptla Kalan |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04477 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 39.5 acres, this one is larger than 53% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 81.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Khaptla Kalan, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of EC Riverbed Sand/Morrum mining project on River Ken located at… — environmental approval granted, 500 m away
- "Sand / Morrum Mining" from Riverbed of Ken River Village- Khaptiha Kalan,… — cleared for impact study, 550 m away
- Sand/Morrum Mining Project on Area- 39.52 Acre (16.0Ha) On Ken River For… — lapsed, 1.1 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Ken River… — more information requested, 1.1 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Ken River… — cleared for impact study, 1.1 km away
- "Sand/Morrum Mining" at Gata No. Part of 100 (Khand No.-03), area- 16 Ha.,… — environmental approval granted, 1.3 km away
- "Sand/Morrum Mining" at Gata No. Part of 100 (Khand No.-03), area- 16 Ha.,… — cleared for impact study, 1.3 km away
- Proposed "Sand/Morrum Mining Project" located at Gata No. Part of 356 (Khand-… — more information requested, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.