Project details
| Official title | Proposed "Ordinary Earth Mining Project" of Shri Raghvinder S/o Shri Dal Bahadur, located at Gata No. 693, 698, 707, 689, 687, Area- 1.2270 ha located at Village- Behta Khurd, Tehsil- Raebareli, District- Raebareli, State- Uttar Pradesh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Jun 2025 |
| Application filed | 18 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Raghvinddar |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹19 lakh |
| Village / locality | Behta Khurd |
| Taluk / tehsil | Rae Bareli |
| District | Rae Bareli |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03344 |
In context
26 applications in Rae Bareli since January 2022 are in the same category (Mining): 21 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 73% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Behta Khurd, Rae Bareli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Ordinary Soil Mining Project of Prop. Shri Raghvinddar located at… — environmental approval granted, 1.7 km away
- Ordinary Earth Mining Project Gata No.- 516, 480 Village: Jaraula, Tehsil:… — more information requested, 2.2 km away
- Ordinary Earth Mining Project Gata No.- 1903, Village: Lodhwari, Tehsil:… — environmental approval granted, 3.5 km away
- Proposed Forest Land to be diverted for construction of 04 Lane Railway Over… — forest land use approved, 4 km away
- Proposed Forest Land to be diverted for construction of 04 Lane Railway Over… — lapsed, 4.3 km away
- Proposed Clinker Grinding unit capacity 3,60,000 TPA (1000 TPD) at Plot No: UD… — environmental approval granted, 5.3 km away
- "Ordinary Soil Mining Project" at Gata No.- 1466, 1468 & 1473 — environmental approval granted, 5.4 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Bharat… — under forest review, 5.8 km away
More from Raghvinddar in Rae Bareli
- Proposed "Belakhara Soil Deposit Mining Project" of Shri Raghvinder S/o Shri… — environmental approval granted
- Proposed Ordinary Soil Mining Project of Prop. Shri Raghvinddar located at… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.