Project details
| Official title | Proposed "Belakhara Soil Deposit Mining Project" of Shri Raghvinder S/o Shri Dal Bahadur, located at Gata No. 1888Mi (Khata No. 15), 1888Mi (Khata No. 121), 1856Mi (Khata No. 213) & 1856Mi (Khata No. 927), Area- 1.264 ha located at Village- Belakhara, Tehsil- Raebareli, District- Raebareli, State- Uttar Pradesh |
|---|---|
| Status | Environmental approval granted |
| Status since | 26 Aug 2026 |
| Application filed | 17 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Raghvinddar |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹14 lakh |
| Village / locality | Belakhara |
| Taluk / tehsil | Rae Bareli |
| District | Rae Bareli |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04305 |
In context
26 applications in Rae Bareli since January 2022 are in the same category (Mining): 21 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.1 acres, this one is smaller than 69% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Belakhara, Rae Bareli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Ordinary Earth Mining Project" of Bhuvnesh Pratap Singh S/o Shri… — environmental approval granted, 3 km away
- Proposed Ordinary Soil Mining Project of Prop. Shri Ajay Singh located at… — environmental approval granted, 3.6 km away
- Proposed Ordinary Soil Mining Project of Prop. Shri Udai Bhan Chaudhari… — environmental approval granted, 7.2 km away
- Ordinary Earth Mining Project Gata No.- 355, 356, 280, 9, 271, 12, 15, 24… — environmental approval granted, 7.2 km away
- Ordinary Soil Mining Project — environmental approval granted, 7.2 km away
- Proposed Forest Land to be diverted for construction of 04 Lane Railway Over… — lapsed, 7.3 km away
- Proposed Forest Land to be diverted for construction of 04 Lane Railway Over… — forest land use approved, 7.4 km away
- Raebareli Ring Road (Phase-2) with Four Lane Configuration (Design Length… — in-principle approval, conditions pending, 8.6 km away
More from Raghvinddar in Rae Bareli
- Proposed "Ordinary Earth Mining Project" of Shri Raghvinder S/o Shri Dal… — environmental approval granted
- Proposed Ordinary Soil Mining Project of Prop. Shri Raghvinddar located at… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.