Quick answers
What is this project?
"Ordinary Soil Mining" Project at Gata No.- 246, 247, 248, 249, 250, 251, 252, 270, 272, 273, Village- Nagla Girdhar, Tehsil- Mahavan, District- Mathura, Uttar Pradesh. (Area-1.9652 Ha). Shri Jaypal is an approved mining project in Nagala Girdhar, Mahavan, Mathura, Uttar Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Jaypal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 May 2026), as of 27 Nov 2026.
Where is it?
In Nagala Girdhar, Mahavan, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹19 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 31 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 May 2026 |
| Application filed | 31 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jaypal |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹19 lakh |
| Village / locality | Nagala Girdhar |
| Taluk / tehsil | Mahavan |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03356 |
In context
28 applications in Mathura since January 2022 are in the same category (Mining): 10 approved, 18 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is smaller than 64% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Nagala Girdhar, Mahavan, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Mining" Project at Gata No.- 23मि०, Village- Churmura, Tehsil-… — environmental approval granted, 8.7 km away
- Proposed "Ordinary Soil Mining" Project at Gata No.- 275,290/1,290/2,291क,… — under environmental review, 9.6 km away
- Proposed Project "Ramaa Research & Science Foundation Capacity: Medical… — lapsed, 10.1 km away
- "Ordinary Soil Mining" Project at Gata No.- 157, 158, 162, 165, 185, Village-… — environmental approval granted, 13.9 km away
- "Ordinary Soil Mining" Project at Gata No.- 354, 356, 357, Village-Nagla… — under environmental review, 14.2 km away
- Re-DIVERSION OF 0.7392 HECTARE PROTECTED FOREST LAND PROPOSED TO BE DIVERTED… — forest land use approved, 14.7 km away
- Proposed Forest Land to be Diverted for Laying of Gas Pipeline — forest land use approved, 15.5 km away
- Proposed Forest Land to be Diverted for Laying of Gas Pipeline — lapsed, 15.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.