Quick answers
What is this project?
Re-DIVERSION OF 0.7392 HECTARE PROTECTED FOREST LAND PROPOSED TO BE DIVERTED FOR PROJECT MANAGER YAMUNA POLLUTION CONTROL UNIT, U.P JAL NIGAM (RURAL) AGRA, SEWERAGE SCHEME OF NAMAMI GANGE, MATHURA (I & D AND STP WORKS FOR BALANCE DRAINS) PROPOSED RISING MAIN LINE ON TANK CHAURAHA- AURANGABAD TIRAHA ROAD is an approved road project in Aurangabad, Mathura, Uttar Pradesh. The site covers 1.8 acres.
Who is building it?
The applicant is Yamuna Pollution Control Unit I Up Jal Nigam Agra.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 27 Jan 2026), as of 27 Nov 2026.
Where is it?
In Aurangabad, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹18 crore; a site of 1.8 acres and 1.8 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 28 Feb 2025.
Project details
| Official title | Re-DIVERSION OF 0.7392 HECTARE PROTECTED FOREST LAND PROPOSED TO BE DIVERTED FOR PROJECT MANAGER YAMUNA POLLUTION CONTROL UNIT, U.P JAL NIGAM (RURAL) AGRA, SEWERAGE SCHEME OF NAMAMI GANGE, MATHURA (I & D AND STP WORKS FOR BALANCE DRAINS) PROPOSED RISING MAIN LINE ON TANK CHAURAHA- AURANGABAD TIRAHA ROAD AT TEHSIL- SADAR & DISTRICT- MATHURA, UTTAR PRADESH. |
|---|---|
| Status | Forest land use approved |
| Status since | 27 Jan 2026 |
| Application filed | 28 Feb 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Yamuna Pollution Control Unit I Up Jal Nigam Agra |
| Land area | 1.8 acres (0.7 ha) |
| Forest land | 1.8 acres (0.7 ha) |
| Project cost | ₹18 crore |
| Village / locality | Aurangabad |
| Taluk / tehsil | Mathura |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05550 |
In context
10 applications in Mathura since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aurangabad, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Laying of Gas Pipeline — forest land use approved, 850 m away
- Proposed Forest Land to be Diverted for Laying of Gas Pipeline — lapsed, 850 m away
- Proposed 190 bedded Military Hospital at Mathura, Mathura Cantt, Uttar Pradesh… — under environmental review, 2.8 km away
- "Ordinary Soil Mining" Project at Gata No.- 157, 158, 162, 165, 185, Village-… — environmental approval granted, 3.4 km away
- Widening of the Bareilly-Mathura Road (NH-530B) from Km. Chainage 257+600 to… — forest land use approved, 4.7 km away
- Permission for Sanwariya Gas Ltd Under Torrent Gas Ltd. laying125mm MDPE Gas… — in-principle approval, conditions pending, 5.4 km away
- New Entry Gate near Laxmi Nagar Crossing at Km. Chainage 83+600 of… — more information requested, 6.7 km away
- Diversion of protected forest land for Construction of approach road to the… — forest land use approved, 7.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.