Quick answers
What is this project?
" Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No. 10/20, Area-30.364 Ha.) Tehsil- Hamirpur, District- Hamirpur, Uttar Pradesh Proposed by Shri Sachin Kumar Singh is a proposed mining project in Indrapuri, Hamirpur, Uttar Pradesh. The site covers 64.4 acres.
Who is building it?
The applicant is Sachin Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Feb 2026), as of 27 Nov 2026.
Where is it?
In Indrapuri, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹95 lakh and a site of 64.4 acres.
When was it filed?
The application was filed on 30 Oct 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Feb 2026 |
| Application filed | 30 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Sachin Singh |
| Land area | 64.4 acres (26.1 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Indrapuri |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03360 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Oct 2026 | Initial checks | 64.4 acres | ₹95 lakh |
| Amendment filed 30 Oct 2025 (this page) | Cleared for impact study | 64.4 acres | ₹95 lakh |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 64.4 acres, this one is larger than 67% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 213.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.
Where it is
Indrapuri, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — initial checks, 0 m away
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — returned to applicant, 50 m away
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — cleared for impact study, 50 m away
- Sand/Morrum Mining along Betwa Riverbed, Khand No 10/21, Village-Indrapuri,… — more information requested, 400 m away
- Sand/Morrum Mining along Betwa Riverbed, Khand No 10/21, Village-Indrapuri,… — cleared for impact study, 400 m away
- Riverbed sand/morrum mining having lease area 31.578 ha along river Betwa in… — returned to applicant, 400 m away
- "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Indrapuri, Bajehata… — more information requested, 850 m away
- "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri, Khand No.-… — lapsed, 850 m away
More from Sachin Singh in Hamirpur
- "Sand/Morrum Mine" from Riverbed of Betwa River — under environmental review
- "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri, Kupra (Old… — cleared for impact study
- "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri, Kupra (Old… — lapsed
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — returned to applicant
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.