Quick answers
What is this project?
"Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri, Kupra (Old Name: Beri), Khand No.- 10/33 (Beri- Gata No.-730/932/1, 897/931; Kupra- Gata No.- 01/7, 02/11), Area- 20.242 Ha. (50.0 Acres), Tehsil- Hamirpur, District- Hamirpur, Uttar Pradesh, Project Proponent- Shri Sachin Kumar Singh S/o Shri Ram Kumar Singh is a lapsed mining project in Beri, Hamirpur, Uttar Pradesh. The site covers 50 acres.
Who is building it?
The applicant is Sachin Singh.
Has it been approved?
No. The application was lapsed on 8 Aug 2025, so it is no longer under consideration.
Where is it?
In Beri, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹11.2 crore and a site of 50 acres.
When was it filed?
The application was filed on 21 Apr 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 8 Aug 2025 |
| Application filed | 21 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sachin Singh |
| Land area | 50 acres (20.2 ha) |
| Project cost | ₹11.2 crore |
| Village / locality | Beri |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03540 |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 50 acres, this one is larger than 50% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 130.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Beri, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri, Kupra (Old… — cleared for impact study, 0 m away
- Proposed Project "Morrum Mining" at Gata No. 897/931/1, 01/7, 02/11 (Khand-… — under environmental review, 400 m away
- "Morrum Mine" Khand Sankhya-23/30 & Gata No.-897/931/1, 01/7, 02/11 over an… — environmental approval granted, 900 m away
- "Morrum Mine" Khand Sankhya-23/30 & Gata No.-897/931/1, 01/7, 02/11 over an… — cleared for impact study, 900 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 1.1 km away
- Riverbed Sand/Morrum Mining Project (Betwa River) — environmental approval granted, 1.4 km away
- "Morrum Mining Project" on the riverbank of River Betwa at Khand No. 23/27,… — more information requested, 1.4 km away
- "Sand/Morrum Mine" from Riverbed of Betwa River — under environmental review, 1.4 km away
More from Sachin Singh in Hamirpur
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — initial checks
- "Sand/Morrum Mine" from Riverbed of Betwa River — under environmental review
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — cleared for impact study
- "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri, Kupra (Old… — cleared for impact study
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — returned to applicant
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.